Sunday, April 10, 2011

Volunteering at Fisherman's Bend



It's been a wet winter with lots of white stuff coming down and on the ground to many times to count. The tile that we expected in October arrived the end of February in a snow storm. I am not exactly sure how the semi-truck got here safely. The comments made was that it was a female driver. Anyone else would have waited two more days. We were all glad to see it arrive but were just a little concerned that the driver would be able to get down below snow level safely.

From the first week in March until now, tiling has been the #1 project in the campground. We are about three weeks away from opening day as I type this and at least the two shower buildings in the Camp Loop area will be fully functional and open.
Click on Photo to see album:

0 Comments:

Post a Comment

<< Home